From: route@monster.com
Sent: Saturday, April 16, 2016 2:05 PM
To: hg@apeironinc.com
Subject: Please review this candidate for: NSN Construction Manager
This resume has been forwarded to
you at the request of Monster User xapeix03
|
|||||||
|
|||||||
|
|
|
||||||
|
||||||
|
ANTHONY
J. TADDONI0 PO Box
598 Chester,
South Carolina 29706 anthony559@operamail.com 803-379-1114 PROFILE Comprehensive
hands-on experience in all aspects of project management in a wide variety of
wireless and telecommunications industries. Also
other business environments, including manufacturing,
construction, automotive and sales. Profitably
coordinate new business development, job scheduling, contract negotiations,
bidding, estimates, business proposals, blueprint reading, team participation
and staff supervision. Successfully
develop and implement plans to increase productivity, reduce costs, and
enhance market position and meet strategic goals. Develop
training processes for employees and contractors to meet the quality
requirements of the client. Develop
and implement the quality control and punch walks for the project at hand Effectively
plan and conduct detailed presentations in a professional manner; quick
learner in highly technical and mechanical situations; skilled in in-house
construction and renovation
projects.
RECENT
TRAINING: Nokia,
T-mobile project training 06/2012
Nokia flexi install training 06/2012
Nokia Flexi Commissioning and integration training 03/2012
Nokia site survey training 11/2011
CPR course 11/2011
First aid
course
10/2011
AT&T LSO Training, Supplier Awareness 10/2011
AT&T LSO Training, Ask yourself 10/2011
AT&T LSO Training, Methods of Procedure 10/2011
AT&T LSO Training, TP73600 Nokia 3G
Basics,
2008
Nokia flexi Boot camp (level 2 - Installation, Commissioning and Integration) 2008
PTID# 001AVN03511 EMPLOYMENT: TeleTech
Team Nov 2013
thru March 2014 Fort
Wayne, IN Project
Mgr. /Construction Manager/Trainer Trained
and managed Antenna and line crews for the AT&T LTE project. Performed
site walks, crew training, climbed tower, punch walks, trained crews on all
aspects of equipment installation Both Tower and Ground, Managed all aspects
of project from managerial position to actual hands on field management
daily. TNT AUG 2013
thru Sept 2013 Cleveland,
Ohio Construction
Mgr. / Auditor Completed
Ground surveys (audits) for the for the AT&T LTE project TeleTech
Team June 2013
thru July 2013 Corpus
Christi, Tx. Construction
Manager/Trainer Trained
and managed Antenna and line crews for the AT&T LTE project. Performed
site walks, crew training, climbed tower, punch walks, trained crews on all
aspects of equipment installation Both Tower and Ground, Managed all aspects
of project from managerial position to actual hands on field management
daily. Took the
crews from 12 to 15 day installation to 3 to 5 day completion of installation Synergy March
2013 thru May 2013 Chicago,
IL Field
tech on T-Mobile/Nokia FSMB swap out project Lemcon September
2012 thru February 2013 NY/NJ, Lead
field tech/software installer NY/NJ
AT&T 2C upgrades, Hurricane Sandy relief installations and
troubleshooting. NY/NJ,
AT&T 4C and 5C Nokia consolidation and upgrade. Dallas,
T-Mobile system module software installation TNT August
2012 thru September 2012 Auditor Cleveland,
OH. / Pittsburg. PA T-Mobile
site audits (Surveys) Lemcon April
2012 thru July 2012 Field
Tech/ Auditor New York,
NY. / Houston, TX. New York
market: field tech AT&T 4C and 5C consolidation and new build project.
Consolidate Nokia 2G Ultrasite cabinets, commission and integrate, and
install, commission, integrate and troubleshoot new build Ultrasite Cabinets Houston,
TX. Market: T-Mobile Site Audits (Survey) TNT November
2011 thru Feb 2012 Installer/Auditor Cleveland
OH: Installed AT&T FIF racks for the LTE
equipment, ran and terminated the -48V power ran the fiber optic cable to the
rack and secured in the cable management tray, installed ground leads. Columbus
OH/Pittsburg PA: AT&T Site audits Lemcon February
2010 thru November 2011 Construction
Manager/Lead field tech Dallas,
TX: Level 3 installer, Lightsquared Test Lab,
Installed Nokia, Sun and other equip for the test lab Michigan/Indiana:
Lead field tech, AT&T/Centennial 850 2G
overlay, Installed, commissioned, integrated
and
troubleshot the Nokia Ultrasite equipment. Houston,
TX: Construction Mgr., for the LightSquared Backhaul
site audits, Visited sites, made drawings, took photos,
traced fiber routes, gathered required information, made recommendations,
converted all info
and drawings to “Viso” for submitting to client. Orlando,
FL: Lead field tech, T-Mobile Optimization,
commissioned, integrated, troubleshot Nokia flexi,
RETS and Mast head amplifiers. Memphis,
TN: Lead field tech, T-Mobile Optimization,
commissioned, integrated, troubleshot
Nokia flexi and the RETS and Mast head amplifiers. Puerto
Rico: Lead field tech, T-Mobile UMTS, Installed,
commissioned, integrated, call tested and troubleshot Nokia
Flexi equipment including troubleshooting the RETS and MHA’s and T-1
systems
Nashville,
TN: LTE Prep for Verizon, Installed GPS antenna mount
and coax, terminated both ends,
Ran alarm cable, ground, and inside gps cable to new proposed equipment location
to Verizon specs
with Lacing, Made and ran jumper coax. Ran new power cables and terminated
them in the existing
“Hot” DC power cabinet and
installed new breakers with safety lock outs. Pittsburgh
PA: Lead field tech, T-Mobile expansion, Installed,
commissioned, integrated, call tested and troubleshot
Nokia flexi and T-1 systems also did the HSPA prep. Clearwire,
(Tech systems) Construction
Manager/Field tech October
2009 to January 2010 Oversaw
the crews decommissioning the old Clearwire network Installed
new equipment. Did
service call and troubleshooting at customers houses Installed
systems in apartment complexes and hotels. EXI
Parsons Construction
Manager September
2009 (Project
overstaffed, last in, first out) Performed
bid walks with contractors in the Ottawa Market for Globallive/Wind. Oversaw
contractors to assure quality on time completion of projects. Continually
assessed project to ensure they remained within budget guidelines. Performed
pre punch walks and final punch walk before turnover to client. Prithvi-Protech T-Mobile Commission,
Integrating, and call testing July 2009
(Short term project, Market Complete) Commission
and integrate Nokia Flexi 3G WCDMA sites. Troubleshoot
T-1, Software and Hardware issues at the site. Perform
call testing for site acceptance. Perform
E-911 call testing on new sites. Complete
Certificate of Completion for each phase of BTS acceptance. (Commissioning,
integration, call testing) Worked
with war room and T-Mobile switch to help resolve problems Clean up
and rework poor quality installation workmanship and install jumpers. AT&T Tower
audits Michigan
Market June 2009
(Short term project, Market Completed) Preformed
tower top audits for AT&T thru Morrison Hershfield/Jtec enterprises. Identified
AT&T equipment on towers (Antenna’s, Microwave dishes, Coax) Took
Photo’s of all equipment and equipment info (serial numbers, etc.) Performed
center line tape drops to supply RF Engineering with an accurate height of
their “rad” centers Verified
antenna down tilts and azimuths were accurate as per RF Engineering
requirements. Verizon/Alltel Site
Auditor Greenville,
SC Market March-April,
2009 (Short term project, Market Completed) Perform
in depth audits and final quality checks on existing Verizon and Alltel
sites. Identify
and record all equipment accurately so Verizon has an accurate inventory of
their equipment at that location. Make
scale drawings of the cell site (inside shelter) so Verizon can determine
space available for future equipment. Make a
scale drawing of entire compound so Verizon can determine space available for
future equipment. Submit
reports using Microsoft Excel, Word and Streets and trips(used to verify lat
and long) Use
rangefinder to determine height of tower and antenna placement.
Glotel,
Philadelphia, PA Installer December,
2008 (Short term Project, Goals met, Project Complete) AT&T
jumper change out project Assessed
jumpers to be changed out, figured out routing of jumpers. Custom made
jumpers to fit and installed Avion
Systems, Roswell, Georgia (Independent Contractor) Commissioner/Integrator June-October,
2008 Performed
call testing of the T-Mobile 3G flexi (Nokia) in the Atlanta, Chicago and
Birmingham markets. Performed
fault analysis and repair as necessary on BTS and T1 issues. Performed
Manual Commissioning and training for the Nokia 3G flexi for Guamcell, on the
island of Guam. Troubleshoot
and make recommendations to repair the Nokia 2G cabinet corrosion and top
cover latch issues on the island of Guam Westower/T-Mobile,
Miami, Florida Installation,
Commissioner/Integrator March-June,
2008 Responsible
for the Installation, Commissioning and Integration of the Nokia Flexi (3G) Troubleshooting
Flexi and T-1 issues Coordinating
efforts with multiple control centers and vendors Site
surveys Completing
and updating site reports Nokia
Siemens Networks, (thru Lemcon) Orlando, FL. Construction
Manager December,
2007 Perform
pre construction walks for T-Mobile UMTS project Put
together closeout documents Worked
with contractors to ensure they new the scope of work and instructed them on
how to fill out the required documents Conducted
weekly safety meetings and Quality Control BaranTelecom,
Orlando, Florida Construction
Manager August-December,
2007 Perform
pre construction walks for T-Mobile UMTS project Put
together closeout documents Worked
with contractors to ensure they new the scope of work and instructed them on
how to fill out the required documents Conducted
weekly safety meetings and Quality Control Prince
and Associates, Charlotte, NC Construction
Manager January-August,
2007
Oversaw
installation of Battery Backup system for AT&T Perform
site visits for Cingular Battery Back-Up installation Plan
scope of work and met with contractors to review and award work Ericsson,
Columbia, SC Construction
Manager August-November,
2006 Oversaw
installation and Integration of UMTS equipment on Cingular sites Performed
site visits with local phone companies for installation of new T1 lines Worked
with “Tiger Team” to solve problems that arose after Integration Performed
site visits to insure work was performed correctly by the contractor Compass
Technology Services, Columbia SC Construction
Manager May, 2005
- June, 2006 Oversaw
Cingular generator project Performed
site visits to determine feasibility and location of generator, Made
sketches of sites and forwarded info to
engineers Worked
with General and sub contractors to insure the proper Installation
of generators and the collection of close-out documents Regenerated
Resources, Bentonville. AR Project
Superintendent October,
2004 - April, 2005 In Charge
of field activities for the reconstruction of a fertilizer plant Supervised
in house labor in the demolition of existing equipment and in the rehab and
fabrication of the used and new equip Worked
closely with the engineers to help design the new facility, Ordered
materials, tools and equipment as needed for the project, Put together and
held weekly safety meeting and oversaw daily tailgate
meetings
Westower
Communications Inc., (Formerly SpectraSite Comm. Inc.,) Charlotte, NC. Project
Manager /Superintendent May,
2000- July, 2004 In charge
of field activities for the construction of tower sites for the wireless
industry Supervised
in house labor and subcontractors in the construction of grass-root sites,
collocates, rooftop and build out installations Worked on
average 8-12 sites at a time, and as many as 15 at once Worked
with representatives from AT&T, BellSouth (Cingular), Cricket, Lucent,
Nextel, Sprint, also Management Companies, (Bechtel, CompassTS, Morrison
Hershfield) Brooks
Builders, Miami, Fl. Project
Superintendent February,
1999 - May, 2000 In charge
of field activities for a $3.5 million Emergency Operations center for the
South Florida water management district Worked
closely with engineers and sub contractors to develop construction means and
methods for this hurricane resistant building O'Brien
& Gere Technical Services, Syracuse, NY Project
Manager/Site Superintendent April, -
December, 1998 Directed
construction activity for a $2.5 million wastewater recycling facility In
Cowpens, SC with a team of ten professionals and up to 60 employees In charge
of purchasing, quality control, materials handling, shipping/receiving and
Planning/Scheduling Promoted
to oversee this assignment within six months after successfully turning this
operation
around
Lewis
County Dairy, Lowville, NY Maintenance
Manager/Project Manager 1997-1998 In charge
of all aspects of plant operations, including facility maintenance,
production equipment repair & selection, vendor contact and capital
purchasing with a staff of eight Successfully
turned production operations around to reach new levels of productivity and
efficiency Oversaw
in-house renovation of a facility to serve as a warehouse, as well as
conversion of storage tanks, sanitary hook-ups and installation of stainless
steel piping for production applications Personally
designed a water treatment plant, along with a sewage treatment
system Independent
Mechanical Contractor, Watertown, NY Owner/Operator 1987-1997 Responsible
for the sale of maintenance and repair services involving all types of
commercial equipment, such as various forms of production/ packaging
machinery, small engines, small plants, heavy trucks and cars. Handle all
billing, invoicing, purchasing and scheduling functions, along with quality
control, final inspections and general troubleshooting Worked
closely with a well-drilling company in the repair and maintenance of heavy
equipment Assisted
North Operations in the maintenance and upkeep of a sewage treatment plant,
as well as the installation of a computer-controlled ground water reclamation
project |
|
|
||||||||
|
|
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
|